Boiler Sequencing
In stock
$0.00
This incentive is available for the installation of sequence controls on both existing boilers and new boilers equipped with built-in controls.
You have a saved application!
You can either continue where you left off or start over. Starting a new application will delete your saved progress.
Required Documentation:
• Documents presenting the new control sequence.
• Boiler specifications.
• Nominal unit ratings (MBH) for all boilers involved in the project.
• Applicability: Eligible for heating systems equipped with at least two boilers that are currently isolated and operate in parallel piping systems.
• Qualifying Efficiency Requirement: Enabled sequence controls.
• Exclusions:
- Redundant boilers.
• Other requirements:
- Boilers must be capable of being sequenced and staged, both enabled and disabled.
- Must ensure the hydronic flow is stopped within fifteen minutes of a boiler’s deactivation.
- Enable and disable boilers in a manner that optimizes their operation, adhering to the manufacturer’s recommendations.