HVAC Boiler Economizer

In stock
$0.00
This incentive is available for the addition of a stack economizer to the exhaust flue stack of both existing and new boilers to recover waste heat.

Out Of Stock

You have a saved application!

Required Documentation:
• Boiler specifications.
• Confirmation of reduction in exhaust flue temperature through BMS or boiler control screen.
• Applicability: Eligible for retrofit projects and new constructions, and for traditional (non-condensing) and condensing stack economizers.
• Qualifying Efficiency Requirement: The installation of a stack economizer.
• Exclusions:
- Redundant boilers.
- Stack economizers installed on boilers primarily used for domestic hot water or pool or spa.
• Other requirements: University and hospital boilers, even those providing space heating, are considered process boilers.