Linkageless Controls
In stock
$0.00
This incentive is available for replacing boiler linkage controls with linkageless controls.
You have a saved application!
You can either continue where you left off or start over. Starting a new application will delete your saved progress.
Required Documentation:
• Boiler specifications.
• It is recommended to collect boiler loading data documenting year-round operation and typical part loading throughout the year for university and hospital boilers.
• Applicability: Eligible for existing boiler retrofit, new boilers, and new construction.
• Qualifying Efficiency Requirement: The replacement of existing linkage controls with linkageless controls
• Exclusions:
o Redundant boilers.
o Boilers primarily used for domestic hot water or pool or spa.
o New construction on HVAC boilers.
• Other requirements:
o Process boilers must operate year-round, and HVAC boilers are utilized during only the heating season (are limited to weather sensitive measures).
o University and hospital boilers, even those providing space heating, are considered process boilers.