Modulating Boiler Control
In stock
$0.00
This incentive is available for the additional modulating (turndown) controls on barriers.
You have a saved application!
You can either continue where you left off or start over. Starting a new application will delete your saved progress.
Required Documentation:
• It is recommended to collect boiler loading data documenting year-round operation and typical part loading throughout the year for university and hospital boilers.
• Incentive is based on boiler input capacity.
• Available for retrofit, boiler replacement, or as part of new construction.
• Process boiler must run year-round. HVAC boilers will run only during the heating season.
• University and hospital boilers are considered process boilers even if they provide space heating.
• Boilers primarily used for domestic hot water or pool or spa use are not eligible.
• Existing boilers must be on/off with no modulation.
• Redundant boilers do not qualify.
Applicability:
• Eligible for retrofit, boiler replacement, and new construction projects.
• Qualifying Efficiency Requirement: Boilers must have a minimum turndown ratio of 5:1.
• Exclusions:
o Redundant boilers or boilers with low annual runtime hours.
o Boilers primarily used for domestic hot water or pool or spa.
• Other requirements:
o Process boilers must operate year-round, and HVAC boilers are utilized during the only heating season.
o University and hospital boilers, even those providing space heating, are considered process boilers.
o Existing boilers must currently operate on/off with no modulation.